Kenyon Group were commissioned to design and build a Mortuary Installation in a Funeral Directors Garage premises. This was a turn- key package from start to finish. Kenyon Manufactured and installed the Stainless Steel Double Embalming Sink for use with the Kenyon HET style Embalming Trolleys. Kenyon manufactured and installed a Pass Through FD 1-12 Body Chamber with 2 Semi-Obese and 1 Obese section. The Chamber was designed with energy efficiency in mind and to this end, we installed two Refrigeration Systems on a Master and Slave basis. This enables the Chamber to run on one system and the other only coming in to assist and back up under load. This saves Power and in turn creates longevity of the plant. Running costs are reduced and the Carbon Footprint decreased.